Finalizing and Editing Reports

The life of a report: its states, asking Esti for changes (each one is a new version), finalizing the version you deliver, the report composed when a job is completed, retry, download, delete, and Reports on iPhone.

9 min read


A report in Estimatics isn't a file you build by hand. You compose it, Estimatics writes and lays out the PDF, you read it, ask Esti for any changes, and then Finalize the version you deliver. This page covers that whole cycle, from the first compose to deleting a report you no longer need.

Available on every plan. The report types you can compose depend on your account's plan, not on which seat you hold. The 14-day free trial counts as CERTIFY.


Who can do what

RoleWhat they can do in Reports
Super Admin and EstimatorCompose, edit with Esti, finalize, retry and delete
Admin, Coordinator and Field InspectorOpen, read and download

Other roles still see New report and the buttons. When they select one, the action is refused with a message such as "Your role cannot change this. Super Admin and Estimator can."

Which report types your plan composes

Report typePlan
Damage Report, Findings, Geometry Report, Custom ReportEvery plan
Estimate, Analysis, Complete ReportSCOPE and CERTIFY

The New report menu doesn't hide the types your plan doesn't include. If you pick one, you get an error ("Your plan does not include this report type.") instead of a report. Inside a report, sections above your plan are dropped, and sections with no data on the job are skipped. See Report types and how they're composed.


Compose a report

  1. Open the job and go to the Reports tab
  2. Select New report and choose the type. For Custom Report, tick the sections you want and select "Compose (N)"
  3. You'll see "Report composition started." and a new card appears in the list showing composing

You don't have to stay on the page. Open the card to watch progress: "Composing report… This updates live as each section is written," with each section marked done, in progress, or pending.

Each compose adds a new report card. It never overwrites an earlier report. Two report types can compose at the same time on one job. Starting the same type again within about 10 minutes of the last start can answer "A report of this type is already composing for this job." Wait a few minutes and try again.

The estimate check before you compose

When you compose an Estimate, Complete Report or Custom Report and the job has an estimate, Estimatics checks the estimate first ("Checking estimate validation…"). If the estimate has validation failures, you'll see "Estimate has validation failures" with two choices:

  • "Review first" closes the message so you can fix the issues in the Estimate tab
  • "Generate anyway" composes the report, and the PDF includes a visible validation notice

Only failures stop you. Warnings don't. If the check can't finish, you'll see "Could not check the estimate validation — generating without the gate." and the report composes anyway. The check never changes your estimate. More in Validation and what's missing.


Report states

Each card shows one of these states:

StateWhat it means
composingEstimatics is writing the sections and rendering the PDF
readyThe PDF is done. Open it to read, download, edit with Esti, or finalize
finalYou finalized it. This version is frozen and can't be edited
failedSomething went wrong while composing. Open it and select Retry
draftThe report was created but isn't composing yet. You'll rarely see this one. You can delete it

The list updates by itself when a section or the PDF finishes.


Read and download

Open a ready report to see the PDF in the app, with Download, Finalize and close.

Download gets a fresh link every time you select it and opens the PDF in a new browser tab. Download links are short-lived, so select Download again instead of reusing an old link. If you see "Could not refresh the download link. Please try again." or "Could not load the PDF.", try again in a moment.

You can't edit the PDF by hand. Changes go through Esti.


Edit a report with Esti

On the web, an open report has an Esti panel beside the PDF. Ask for changes in plain words, such as "Make the summary more concise."

  1. Open a report that is ready
  2. Type your change in "Describe a change…" and send it
  3. You'll see "Applying your edit…" and then "Updated to vN." when the new version is ready

Every edit creates a new version of the same report. The app shows only the current version; earlier versions can't be opened on screen. Esti uses AI to apply your instruction, so read the updated PDF before you send it.

If you see "Your edit could not be applied.", rephrase the request or try again. There is no visual block editor.


Finalize the version you deliver

  1. Open the report while it shows ready
  2. Select Finalize
  3. You'll see "Report finalized." The button changes to Finalized and the card shows final

A finalized report is locked. The Esti box reads "Editing is locked" and won't accept changes. If you need changes after that, compose a new report.

Finalizing freezes that version inside Estimatics. It doesn't add a digital signature or a seal to the PDF; report sealing and PDF signing aren't turned on today.

If you see "Unable to finalize the report.", try again. If it keeps happening, email support.


The report that composes itself when a job is completed

When a job is marked Completed ("Mark as done" or "Change Status"), Estimatics composes and finalizes the job's report on its own:

  • SCOPE and CERTIFY (and the free trial): a Complete Report
  • FIELD: a Damage Report

It's titled with the job name and the completion date. The job header shows "Report generating…" and then "Job Report" (select it to open the Reports tab), and the report appears in the Reports tab.

  • If a report of that type is already composing or ready but not finalized, it doesn't create a duplicate
  • If the job is reopened and marked Completed again, a new report is composed. The one you already delivered isn't touched
  • It isn't emailed to anyone
  • If it fails, open it in Reports and select Retry. Retry composes a new report that you finalize yourself

Retry a failed report

Open a failed report. You'll see "Report composition failed. You can retry generating this report." Select Retry.

Retry composes a new report of the same type ("Recomposing report…"). The failed card stays in the list; delete it once the new one is ready. If Retry answers "A report of this type is already composing for this job." right after a failure, wait a few minutes and select it again. If you see "Could not load reports. Please try again." on the tab itself, select Retry there.


Delete a report

  1. On the report card, select the trash icon
  2. Confirm "Delete report?" ("[type] will be removed from this job.")
  3. You'll see "Report deleted."

ℹ Note

Finalized reports can be deleted too. Any report, including the one you delivered, disappears from the list when it's deleted. There's no trash to restore it from in the app. Compose it again, or email support@aiestimatics.com.


Reports on iPhone

The iPhone app can compose, view, share and delete reports. Finalizing and editing with Esti are done on the web.

  1. Open the job and go to Reports → "New Report"
  2. Choose a type, or "Custom Report" to pick sections and tap "Compose (N)"
  3. Follow progress on the card (for example "Rendering PDF…")
  4. Tap a finished report to preview the PDF. Touch and hold a report to see "Share / Export" (sends the PDF) and "Delete" (asks "Delete this report?")

Things to know on iPhone:

  • One report generates at a time, and it needs a connection
  • Types your plan doesn't include are marked "— SCOPE" in the menu
  • The same estimate check applies: "Estimate has validation failures" → "Generate anyway" or "Review first"
  • "This report is taking longer than usual." means it's still generating on our side. Come back in a while
  • Only Field Inspectors and Super Admins sign in to the iPhone app, and the role rules above still apply: a Field Inspector can open and share reports but can't compose or delete them

Frequently asked questions

Can I go back to an earlier version of a report? Not in the app. Only the current version is shown. If an Esti edit went the wrong way, ask Esti to change it back, or compose a new report.

I finalized a report and found a typo. What now? A finalized report can't be edited. Compose a new report of the same type, fix it with Esti, and finalize that one. You can delete the old one if you don't want it in the list.

I picked "Complete Report" and got an error. Your account is on FIELD. Complete Report, Estimate and Analysis need SCOPE or CERTIFY.

Does marking a job Completed send the report to the carrier or the homeowner? No. The report composes and is finalized in the Reports tab, and it isn't emailed to anyone. You download or share it yourself.

My report doesn't include the estimate. Either the job has no estimate yet, or your plan doesn't include the Estimate section (it needs SCOPE).

Can someone outside my team edit a report? No. Only Super Admins and Estimators on your account can compose, edit, finalize or delete reports.



Last updated: October 2026 · Questions? Email support@aiestimatics.com