Report Types and How They're Composed
The seven report types, the nine sections they're built from, and the two rules that decide what actually lands in your PDF: the type's plan gate and each section's own.
6 min read
You don't lay out a report in Estimatics. You pick a type, and it composes the right sections from what's on the job, in a fixed order, and renders a PDF.
Understanding the two gating rules below is the difference between getting the report you expected and wondering where a section went.
The nine sections
| Section | What it is | Built from | Minimum plan |
|---|---|---|---|
| Cover | Property, claim and inspection details, with your logo, company name and phone | Job data | FIELD |
| Executive Summary | An AI-drafted overview of the inspection and its key findings | AI | FIELD |
| Findings | The findings table, confirmed and inferred | Finding records | FIELD |
| Damage Findings | The AI-drafted narrative describing each finding in detail | AI | SCOPE |
| Floor Plan & 3D Sketch | Top-down site plan and 3D axonometric of the scanned areas | LiDAR geometry | FIELD |
| Area Dimensions | Per-area floor area, perimeter, wall area, ceiling height, openings | LiDAR geometry | FIELD |
| Evidence | A grid of the photos linked to the findings | Capture | FIELD |
| Estimate | The line-item estimate with coverage totals | The active estimate | SCOPE |
| Cause & Origin | The AI cause-and-origin analysis | AI | CERTIFY |
The seven report types
These are the types in the New report menu on the job's Reports tab.
| Type (menu label) | Sections it composes | Minimum plan to compose |
|---|---|---|
| Damage Report | Cover · Executive Summary · Findings · Damage Findings · Evidence · Cause & Origin | FIELD |
| Findings | Cover · Findings · Damage Findings · Evidence | FIELD |
| Geometry Report | Cover · Floor Plan & 3D Sketch · Area Dimensions | FIELD |
| Custom Report | Whatever you pick | FIELD |
| Estimate | Cover · Estimate | SCOPE |
| Analysis | Cover · Executive Summary · Damage Findings · Cause & Origin | SCOPE |
| Complete Report | All nine, in canonical order | SCOPE |
The two rules that decide what you get
Both rules follow your account's plan. It doesn't matter which seat the person composing holds: everyone on the account gets the same report from the same job. The 14-day free trial counts as CERTIFY.
Rule one: the type has a plan gate. Estimate, Analysis, and Complete Report need SCOPE or higher. The menu doesn't hide them on FIELD. If you try to compose one, you get an error telling you the plan doesn't include it.
Rule two: each section has its own minimum, and sections above your plan are dropped. This is the one that surprises people.
A Damage Report on FIELD is allowed, because Damage Report gates at FIELD. But it composes as Cover, Executive Summary, Findings, and Evidence. Damage Findings (SCOPE) and Cause & Origin (CERTIFY) are skipped. Same report type, same button, two sections shorter.
The same Damage Report on CERTIFY composes all six.
ℹ Note
In the Custom Report picker, sections your plan doesn't include are not hidden. They are listed greyed out with a plan badge and the reason, "Requires SCOPE" or "Requires CERTIFY".
Sections also drop when the data isn't there
Independently of plan, a section is skipped when the job can't support it:
- Floor Plan & 3D Sketch and Area Dimensions need scanned areas. No LiDAR scan, no geometry sections.
- Findings and Evidence need findings and linked photos.
- Estimate needs a priced estimate on the job.
- Cause & Origin only applies to insurance-claim jobs. On a Work Order or any other job that isn't an insurance claim it doesn't compose at all, regardless of plan.
Nothing errors. The report renders with what the job actually has.
Before an estimate goes into a report
If you choose Estimate, Complete Report or Custom Report on a job that has an estimate, Estimatics first checks the estimate's validation. (For Custom Report, the check runs before the section picker opens.) If there are validation failures you see "Estimate has validation failures" with two choices: "Review first" to go back and fix them, or "Generate anyway". Only failures stop you. Warnings don't, and the PDF mentions them. See The Estimate-Ready Report.
What's on the cover
The cover carries your logo, company name and phone number, taken from Settings → Account Settings → Edit Account, along with the property, claim and inspection details. That is the extent of branding today: there are no custom colors, no per-recipient templates, and no separate carrier or dispute report.
Rendering and states
Composition and rendering run in the background, so you don't sit on the page. Each report card on the Reports tab shows one of these states:
composing → ready → final (once you finalize it), or failed. A draft state also exists.
While a report composes, a live checklist shows each section as it's written. If it fails, open the report and select Retry. A retry creates a new report of the same type; the failed one stays in the list until you delete it.
Super Admins and Estimators compose, edit, finalize and delete reports. Other roles can open and download them.
Each compose is a new report; edits are versions
Composing again doesn't overwrite anything. It adds a new report card, so the report you sent last week and the one you composed today sit side by side. Asking Esti to change a report creates a new version of that report, and the app shows the current version. Selecting Finalize freezes the version you deliver; after that, "Editing is locked".
Details: Finalizing and Editing Reports.
On iPhone
The iPhone app has Reports too. New Report offers "Damage Report", "Findings Report" and "Geometry Report" on every plan, and "Estimate Report", "Analysis Report" and "Complete Report" from SCOPE (on FIELD they are marked "SCOPE" in the menu). "Custom Report" opens a section picker where you pick sections and tap Compose. The PDF opens in the app, and Share / Export sends it. One report composes at a time, and you need a connection. Composing follows the same roles as on the web.
Generating a damage report
The most common deliverable, start to finish.
Finalizing and editing reports
Esti edits, versions, finalize, auto-composed reports, retry and delete.
Building a custom report
Picking sections yourself instead of taking a preset.
Cause & Origin
What the CERTIFY section says, and what it refuses to say.
Evidence integrity
What Estimatics records about every file behind those photos.
Last updated: October 2026 · Questions? Email support@aiestimatics.com
Last updated: October 2026 · Feedback on this article